Site Usage

Preparation … Step 1 Excavate for below plinth work

Preparation… Step 2 Complete foundation & Plinth work

Aluminum Forms can be used for foundation and plinth works

Process… 7 small steps for faster construction

• Using Aluminum formwork for your projects is easy
• In 10 small steps you can complete one floor
• You can build one floor every 2 – 3 days
• Skilled labor is not required
• small steps give you a high quality shell cheaper and faster than a conventionally constructed shell


Process… Step 1 Tie steel reinforcement for shear wall

Process… Step 2 Tie plumbing & electrical conduits

Process… Step 3 Set up the wall forms

Process… Step 4 Set up the ceiling forms

Process… Step 5 Slab steel, electrical & plumbing in slab

Process… Step 6 Pour concrete for walls & slab together (monolithic)

Process… Step 7 Strip the wall forms (next day). Ceiling Forms to be stripped as per structural requirement.

Process… Prepare for next pour Clean the forms for the next reuse

• Clean the face, the side rails, the top rails and the back immediately after stripping
• This improves the finish of the concrete and increases the life of the form

Process… Move to the next level (2 to 3 day cycle time)

Result… Light weight forms allow high productivity